Someone has to decide where zero is. On most projects I've delivered, that decision gets made more than once, by more than one person, in more than one file. Tinker is my experiment in software that makes it once, and then lets everyone build on it.
One site, one datum, three buildings, three different zeros. Which one is "zero" depends on who you ask.
Software should take effort away, not ask for more.
I'm an architect who has spent years delivering BIM projects across India, North America and the Middle East. The tools are powerful. They're also the reason a lot of my week goes into setting things up, checking them and setting them up again.
Tinker is where I try a different order of things: start with what a project team actually agrees on first, make that impossible to get wrong, and build everything else on top. It's slow, public and unfinished on purpose.
Started Oct 2026Built by an architect, not a software companyRuns in a web browser
The log so far
Newest at the bottom · screens show sample data
Entry 01 · 17 Oct 2026
Zero is not a floor
The first rule: natural ground level is the datum, and it's locked. You type the survey RL exactly once. Every other number on every level is worked out from it, never typed.
Levels show three values side by side: the building's own elevation, the site elevation and the survey RL. Floor-to-floor heights that leave too little room for beams, ducts and sprinklers get flagged before anyone draws a ceiling.
What I learnedMost level mistakes aren't wrong numbers. They're numbers typed in two places.
Levels of one tower, with the site in 3D beside it.
Entry 02 · 17 Oct 2026
Every grid line knows where it is on Earth
Each grid intersection carries its own Easting and Northing. Change the coordinate of any one point and the whole grid moves with it, spacings intact. The setout table is ready to paste into a spreadsheet.
What I learnedA column setout drawing is mostly a coordinate table that nobody wanted to retype.
Plan of a building rotated 15°, with true coordinates at each intersection.
Entry 03 · 18 Oct 2026
The sketch that changed the plan
Up to here, Tinker thought in one building. Then I drew how a real project actually flows: one site datum set from the land survey, grids and levels for each tower, and every discipline, from architecture and structure to services and landscape, picking them up before modelling starts.
The notes on the right became rules: the architect sets the datum, it can change, and when it does, everyone is told.
What I learnedDraw the workflow before the feature. One page of sketching rewrote the whole structure.
The original page, drawn on an iPad.
Entry 04 · 18 Oct 2026
Buildings on a slope
Real sites aren't flat. A tower halfway up a contour stands on different ground from a clubhouse at the bottom, with different floor heights too. So each building now has its own zero, its own grid and its own levels, while one site datum keeps them all honest.
In elevation you can see both: the building's ground line, and the site datum 2.400 m below it.
What I learned"Ground floor" means at least three different heights on a hillside project. The software should say which.
One building's elevation. Its ground sits 2.400 m above the site datum.
Entry 05 · 18 Oct 2026
Who is allowed to move zero
Only the lead architect can change a datum. Structure, services and landscape see the same numbers, locked. Every change gets a version number and a line in the log saying what moved, from what, to what, and who has been told.
What I learnedCoordination problems are rarely about geometry. They're about nobody hearing that something changed.
The same project, opened by the structural engineer.Version 2 of the datum, and who was told.
Coming next
Stage 1: columns that know where they stand
The datum is in place. Next, elements start standing on it: columns on grid intersections, then walls and slabs on levels. If it works, the setout drawing should be close to free.
Datums: site, buildings, grids, levels In progress
Architecture Next
Structure Later
Space for services Later
Working together Later
Drawings Later
Services modelling Later
Coordination Later
Being built Not ready to show
Questions I'm still chewing on
Tell me if you've solved these
DatumsOn a hillside site, should each building have its own zero, or should everyone work from one?
ChangesWhen zero moves by 50 mm, who needs to know, and how loudly should they be told?
EffortWhat's one thing you set up by hand on every project that software should just know?
If software has slowed you down in a way you still think about, I'd like to hear it. That's how the next entry gets written.