How buildings really get delivered.

I'm Deepankar Chhetri, an architect who uses BIM to get designs built. Tools keep changing, but buildings still get made by people talking to each other.

Working in project teams, I've collaborated with clients, consultants and contractors across the globe, learning firsthand how design decisions, technology and teamwork shape the way buildings get built. I enjoy sharing these experiences and ideas through videos, writing and talks.

Watch my videos Free resources
Portrait of Deepankar Chhetri in a black sweater, arms crossed, smiling slightly
10M+ sq ft of projects I've been part of, across the globe

Project footprint

Countries where I've contributed to projects as part of multidisciplinary teams.

CANADA USA QATAR INDIA
  • India
  • United States
  • Qatar
  • Canada

Happy to chat about

If any of these is on your mind too, I'd love to hear your take.

Content and Collaboration

Videos, webinars and guest talks for the AEC community. Always up for a podcast, a panel or a classroom conversation about design, construction, technology or building a career in this industry.

BIM Consultation

Why the switch is more about people than software, what teams usually underestimate, and why BIM belongs in the contract, not just the model.

BIM Management

How architecture, structure and MEP can work from one reliable model, and why most clashes are really communication problems that happen to show up on screen first.

Design Development and Documentation

How BIM carries a design from development to issued-for-construction (IFC) sets, and what makes a drawing set something a contractor can actually trust.

Kind words

More on LinkedIn →
Recently, I had the opportunity to work with Deepankar on the design of a prefabricated modular hospital. He provided me with excellent technical support and I can vouch for his extensive knowledge of BIM, his meticulous work and his eagerness to respond to a client's requirements.
Martin Fiset, M. Arch., MRAICHospital planning and design consultant
I am very fortunate to have had the chance to work with Deepankar. He is very professional and knowledgeable in Architecture and BIM software. His incredible skills and knowledge in Revit helped me and the firm enhance the quality of work. I definitely recommend him anywhere, because of his hard and quality work.
Mehmet Arif OzelgulArchitectural Designer

Videos

YouTube channel →
BIM vs Reality! What Happens on a Real Construction Site?
The Taj Mahal Had No CAD or Revit. Why Do We Need Construction Drawings?
Lessons from a 1.5M Sq Ft BIM Project
Top 5 Reasons Construction Projects Fail
AI in Construction: The Uncomfortable Truth
The Ultimate BIM Career Roadmap
FREE RESOURCES

Practical tools from real projects, yours to keep.

Checklists, guides, templates and more, all from my own work. Pick what you need and I'll email it to you.

Plus an occasional note when I have something worth sharing. Unsubscribe anytime.
Browse all resources →
AN EXPERIMENT · OPEN LOG

Tinker

Software should take effort away, not ask for more.

An architect, not a programmer, tinkering together a simple tool from scratch. Years of working around the limits of today's software made me want to try something better, shaped by lessons from real projects and plenty of trial and error.

Have an idea, a frustration with the tools you use today, or want to build alongside me? I'd be glad to hear from you.

Read the Tinker log → Chip in with an idea
tinker / log · 5 entries
SITE ±0.000 −1.500 ±0.000 +2.400
ENTRY 04 · One site, one datum, three buildings, three different zeros.
TOWER C · GROUND +2.400 ABOVE SITE · SITE ±0.000 = RL 201.350
LEVELBUILDINGSITESURVEY RL
Roof+17.400+19.800221.150
L04+13.800+16.200217.550
L03 ▲ 3.000 f-f+10.200+12.600213.950
L02+7.200+9.600210.950
L01+3.600+6.000207.350
GF±0.000+2.400203.750
ENTRY 01 · Every level shows building, site and survey RL. Tight floor-to-floors get flagged.
ENTRY 02 · Every grid intersection knows its Easting and Northing.
ENTRY 03 · The sketch that changed the plan: one datum, every discipline.
DATUM CHANGE LOG🔒 Only the lead architect can edit
v2
Tower C ground: +2.400 → +2.60018 Oct · Lead architect
STR ✓MECH ✓ELEC ✓FIRE ✓PLUMB ✓LAND ✓
v1
Site datum set: ±0.000 = RL 201.35017 Oct · Lead architect
ENTRY 05 · Only the architect moves zero, and everyone hears about it.
Now building: Stage 0 of 7, datums for site, buildings, grids and levels See the full log →
  1. 00 · IN PROGRESS Datums
  2. 01 · NEXT Architecture
  3. 02 · LATER Structure
  4. 03 · LATER Space for services
  5. 04 · LATER Working together
  6. 05 · LATER Drawings
  7. 06 · LATER Services modelling
  8. 07 · LATER Coordination

Let's talk.

Collaborations, speaking, writing, or a good conversation about buildings. I read every message and reply as soon as I can.

© 2026 Deepankar Chhetri